PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished installed the handrails at Stair -4 (1st-4th Floor) Facing East (800x600).jpg Finished installing wire mesh at the slab on grade Facing South (800x600).jpg Finished installing wire mesh at the slab on grade Facing West (800x600).jpg Installed temporary lighting at the 2nd floor Facing West (800x600).jpg Metal tracks (1) (800x600).jpg
Previous page Metal tracks (1) (800x600)
Metal tracks (1) (800x600)